MOCN Lab — Configure, Commit, Verify

Stand up a shared 5G MOCN cell exactly as an engineer does: set two operators and a sharing model, commit, decode SIB1, then drive offered load and watch the per-PLMN PRB KPIs react. Inject a fault and prove the fix.

1

Configure the shared cell

editable
2

SIB1 broadcast (decoded)

after commit
3

Live per-PLMN PRB KPIs — drive the offered-load sliders

Fam 5241
Op A
Op B
free
Op A allocated PRB
Op A demand
Served
Status
Op B allocated PRB
Op B demand
Served
Status
PRB utilizationPLMN = DLUsedPrbPlmn ÷ DLAvailablePrbPlmn × 100 — Fam 5241 · sustained 100% + unmet demand ⇒ starved
4

Verify checklist

5

Fault injection — diagnose & fix

troubleshoot
Cell healthy — both PLMNs served, KPIs within target.

That's the MOCN loop — configure → commit → verify → tune → fix.

The PRB split you set drives the per-PLMN KPI you'd read on the live cell (Fam 5241). Change one thing, watch the KPI, keep every operator inside its SLA.